(R.A., Dec)=(58.846155,31.045835)
MJD=55419.74 - 55419.77
Estimated Process time: 1.0045 minutes
0:00:00 queued |
0:00:01 (extract) GSC Events |
0:00:03 (extract) calculating GSC GTIs |
0:00:13 (building products) image |
0:00:29 (building products) light curve |
0:00:34 (building products) GSC spectrum |
0:00:37 (building products) GSC response |
0:00:46 (finished) |
- IMAGE Download Region file(On-source).
- GSC 2.0-20.0 keV keV
- GSC 4.0-10.0 keV keV Download Image and Region files.
Download Region file(background).
nearbysources:
0.00 deg (58.846,31.046) X_Per 6.66 deg (51.648,28.715) UX_Ari