(R.A., Dec)=(307.6285217,47.86408809)
MJD=58000.0 - 60000.0
Estimated Process time: 301.0 minutes
0:00:00 queued |
0:00:00 (extract) GSC Events(low) |
0:12:28 (extract) calculating GSC GTIs |
0:21:03 (building products) image |
0:22:04 (building products) light curve |
0:35:03 (building products) GSC spectrum |
0:37:07 (building products) GSC response |
0:37:34 (finished) |
- IMAGE Download Region file(On-source).
- GSC 2.0-6.0 keV keV
- GSC 6.0-20.0 keV keV Download Image and Region files.
Download Region file(background).
nearbysources:
5.80 deg (315.541,45.776) V407_Cyg 6.04 deg (315.899,45.752) SAX_J2103.5+4545 6.91 deg (308.108,40.958) Cyg_X-3,V1521_Cyg