(R.A., Dec)=(270.190349,78.467783)
MJD=55300.0 - 60600.0
Estimated Process time: 796.0 minutes
0:00:00 queued |
0:00:00 (extract) GSC Events(low) |
0:32:55 (extract) calculating GSC GTIs |
1:32:40 (building products) image |
1:35:55 (building products) light curve |
2:31:28 (building products) GSC spectrum |
2:50:22 (building products) GSC response |
2:51:08 (finished) |
- IMAGE Download Region file(On-source).
- GSC 2.0-20.0 keV keV
- GSC 2.0-6.0 keV keV Download Image and Region files.
Download Region file(background).
nearbysources:
2.34 deg (280.537,79.771) 3C_390.3 2.82 deg (255.931,78.718) Abell_2256